What is the minimum amount of a Black Belt’s time that should be dedicated to projects and
training?
A. 10%
B. 25%
C. 50%
D. 75%
E. 100% CORRECT ANSWER
<<100%. A Black Belt is a full-time dedicated position. Anything less than 100% will limit Black Belt’s effectiveness.>>