For boiler and vessel code equipment, the Supplier shall submit a Non-Conformance Report (NCR) and a repair procedure for a code related repair for approval by Technip S&W PT. The Supplier shall not proceed with the repair until Technip S&W PT has approved the repair procedure and given direction as to the testing and inspection requirements.