Reasons to Reject 1) Submission Sequence is not acceptable since Overall single line diagram and concept hasn't been dispatched which need to be reviewed in conjunction with the submitted drawing 2) Relaying and metering sizing should be reviewed together with short circuit and voltage drop system study 3) Drawing Title block and KKS numbering is not corresponding with proposed PIMs and Kick-off MOM.