CONTRACTOR shall provide all utilities required consumptions i.e. nitrogen gas, instrument air, demineralized water, potable water, fume gas at chromatography machine (GC), injection molding machine and chemical hood station, and drainage system and all others required for the function of the laboratory and injection molding machine. The completed list of utilities required and their quantities shall be submitted to PACKAGE 1 Contractor during detailed design phase