About the mining project,amount of investment can change according to the size of the operation.
1.For a medium size of operation, size of 1800-2000 Tons/Day, total investment required is 8,875,689 USD. Net monthly income after deducting tax and operation expenses 5,780,313 USD/Month.
2.For a smaller size of operation, size of 1800-2000 Tons/Day, total investment required is 8,875,689 USD. Net monthly income after deducting tax and operation expenses 5,780,313 USD/Month.
3.It is also possible to start with small operation for lower budget, but the production and income will drop much lower.
Please note; as larger is the operation and size, it means higher production per day, which means higher income. I can also propose a big operation, if they have the investment.
Above estimates are only for start mining in one Block of license.
关于采矿项目,投资金额可以更改尺寸的操作。1.对于一个中等大小,大小为 1800年-2000年吨/天,所需的投资总额是操作的 8,875,689 美元。每月净收入扣除税和操作费用 5,780,313 美元/月。2.以减小其大小的操作,大小为 1800年-2000年吨/天,所需的投资总额为 8,875,689 美元。每月净收入扣除税和操作费用 5,780,313 美元/月。3.它也是较低的预算,可能,开始与小手术,但生产和收入将降低得多。请注意 ;如更大的操作和大小,这意味着更高的生产,每一天,这意味着更高的收入。我也可以提出重大的手术,如果他们有投资。以上估计仅为开始采矿许可证的一个块中。
การแปล กรุณารอสักครู่..