After I’ve already meeting with CEC WSM (p’ Somchart) that the twin pod must be going to Songkhla A first. So, if they cannot using our twin pod that they will change the plan to swap our twin pod with some twin pod from Songkhla C.
FYI & FYA…The load out plan is on 22nd Jan’14 and DWM will be travelling to Songkhla A on 23rd Jan’14.