In Fig. 6 the time variation of fault probability F(t), is shown. The fault probability F(t), calculated with (15) provides the likelihood that the predicted DP-value is below the threshold value (chosen 250). Remaining lifetime is based on the risk profile of the asset manager. If a high risk is accepted, the lifetime is longer. If it is not accept almost any risk, the lifetime is much shorter