As ITD demolished tower crane since 17th October 2014 in order to finish the roof construction on 30 November 2014 and still have Derrick Crane size 25 meter can use until 30 November 2014 as reference 1.
The construction that PISA’s responsibility is delay due production line still wants to load and upload the materials. Therefore, we are pleased request PISA to accelerate prepare material for installation according to demolish ITD’s Derrick crane as above.