All
At 14.00 hrs. today VPE held a rescue at height drill, the drill from initial notification to simulated casualty arriving at site clinic was 15 Minutes.
The drill went well, and it was good practice for VPE. A washout meeting was held after the drill to discuss both positive and negative points.
Additional points that came from a post MES PCD meeting will be discussed with VPE.
VPE will issue a drill report. And this can be discussed during the weekly SHES management meeting.