Material Requirements Planning (MRP) • Master schedule, giving the number of every product to be made in every period. • Bill of materials (BOM), listing the materials needed for every product. • Inventory records, showing the materials available.
Material Requirements Planning (MRP)• Master schedule, giving the number of every product to be made in every period.• Bill of materials (BOM), listing the materials needed for every product.• Inventory records, showing the materials available.