In order for such a cost system to be effectively
implemented in shipyards in order to maximize cost savings
presented by pre outfitted, modular construction, it is
necessary that the technical design information sent to the
shipyard is tailored with such a build organization
strategy in mind. Experience from the construction of the
DDG-51 showed that although the shipyards had the
capability to construct the vessel using modular methods
and on block outfitting, the lack of design consideration
to the generic build strategy resulted in excessive reworkings
and a low level of productivity.