8. Revision
When the Control Plan or the Process Condition Sheet is changed, the Work Instruction shall be
revised, examined, and approved according to Chapter 4.
9. Storage
The Group that issued the Work Instruction shall keep the original documents until the time of termination of
production line.
10. Related standards
SASG: L10-03A Control Plan
SASG: L21-01A Process Condition Sheet
SASG: K21-09A Designation of Special Characteristics and Vital Critical Parts
SASG: Z10-03A Technical Documents Numbering System
SASG: K11-02A Past Trouble Data & Past Trouble Check List