am confident with my logics and she talks about something too small. I think big.
The purpose of all her email below is she wants people back or needs more people. This is not a big deal.
We can watch the situation first because I don’t increase her loading and it’s the exactly the same what she do now.
I think the production planning should be located in production, not PC/PD because I want planning and actual production mapping each other.
Now we have a problem with this as always in factory that production planning is not mapping with actual production.
If plan just is plan and production just is production, we never can get to the other level and approaching to efficiency.
Dear both, I want to use her drive supervisors and leaders for routine production so Korn can focus on system/management more in factory 1.