While taking ballast by gravity during loaded passage, the inboard line to the tank should be opened up completely, keeping the sea chest valve closed and only then the sea chest valve should be opened. As in ship’s loaded condition due to deeper draft the sea water comes in with heavy pressure and can damage the line fittings or valves if any valve is closed in between.