The construction of the wall:
A six brick module is laid in staggered courses that create twirling vertical stacks and an undulating surface. The construction of the screen wall was a result of a five-week process devising masonry techniques on site. From verification of plumbline to the structural bonding of the brick courses, methods of brick laying were devised through a deep on-site collaboration between the masons and the architects.