the attach picture you can see the problem with the foundation of post digester tank (I don’t accept).
And for next pouring concrete please follow the stand procedure below.
1.) The period after concrete during development don’t remove formwork before 24 Hrs.
2.) Concrete must be cured immediately after remove the formwork.
Please repair this issue asap , I hope we don’t find this problem again in the future.