C. PROCEDURE
1. Two bearings were mounted on a stand. This were attached to flywheel through a circular pipe Pulley is taken in one is larger and another is smaller dimension .this particularly attached to the stand as shown in figure.
2. The clamp arrangement is made were a crank and pin is attached for higher impact of load through a nut and bolt arrangement.
3. Total eight crank and similar arrangement are attached to the flat belt. This belt is then mounted to the upper pulley and lower pulley through a special type of attaching clamp.