1.9 Details of development activity in the affected area
(a) Drought-prone Area Programme
(b) Small Farmer Development Agency
(c) Rural Development
(d) Tribal Development
(e) Other programmes.
1.10 Sedimentation of the reservoir
(a) Expected rate of siltation
(b) Proposed/existing soil conservation programme/ measures in the catchment
(c) Problems of slips and slides on the periphery of the reservoir and proposed remedial measures.