Two one-week courses were conducted over a
two-week period, with a total of 37 DEOs in attendance.
Emphasis was placed on working groups
solving three field trip cases and the 35 other cases
brought to the course by the DEOs. An initial EIA was
prepared for each case using the traditional EIA outline
and in a role-played public technical meeting. The
outline was used to guide the following steps: