TNP Would like to inform Problems in operation ( 25 July 2015 to 26 July 2015 ) for installation M&E
work. Because FMP Need full area for production. Cannot allow a contractor into operate normally inside existing factory.
TNP can work only part of EE wiring cable to existing office 2 nd floor wrok
That may effect the installation of M&E work Production Area the delay some part in work schedule