1.3 Submittals
1.3.1 The contractor shall submit the technical data, catalogues, cable installation
drawings, cable routes, cable connection and other necessaries of the low
voltage cables for approval before purchasing and installation.
1.3.2 Routine test reports and Type test reports as necessary for each type of cable
in accordance with the standards as mentioned above or submittal of
certificated testing report for standard manufactured.