Till today there is no space to fill the drums, as this 10 cntrs. Of Albatric
Will be lift up, first we will fill drums and empty out storage tank.
Then only we can start production.
AS SUCH we have prepared nearly 35 cntrs before shut down the production
For KSWC BY emptying out one reactor, but it did not gone through .so now
We can start the production only after lifting some cntrs.
So bare with us, and do not loose the orders. And we will try to achieve the targets.