The political situation in the West Bank is described as unstable
because of the occupation and conflict between the Palestinian
and Israeli. This situation leads to high cost of materials,
lack of resources, limitations on material import, and delay.
These results usually lead to an increase of the total project
cost. This delay cause is not discussed in any of the investigated
literature.