The aforementioned two cases for the night operation are as
follows.
Case 1: If the available stored battery energy added to the
minimum gas turbine energy is more than the demanded
energy from the loads ( _ Ebat_1/2h_rest +
_ EMGT_1/2_min >_ Eload_1/2h), priority is given to
the active generator for the electrical production
since it has enough previously stored energy from
PV panels. The gas turbine will work with minimum
power