Thank you very much and I’ve looked at the site which also shows two ATR72s becoming available around the same time ie Q3 this year. Can I assume you have not yet issued an RFP for these aircraft please, nor the 737-400s? Can I also assume that, as a result of this email exchange, I will receive the RFPs for these and any other aircraft when they are issued?