It also can lead to a high volume of leachate; the storage sites of SCW for more than 150 tons must meet specific design requirements including the collection of leachate (WI DNR— Administrative Code NR 213.13).
It also can lead to a high volume ofleachate; the storage sites of SCW for more than 150tons must meet specific design requirements includingthe collection of leachate (WI DNR— AdministrativeCode NR 213.13).