PART I: Recommendations for establishing means through parallel testing of new
chemistry control lots
1. Parallel testing is running the current and new QC material together. Run the current QC lot and verify that the QC material is within range. Then run the new QC lot 2 to 3 times throughout the day ideally for a minimum of seven to ten days
before the old lot expires. Collect at least 20 data points.