DÜRR shall supervise the manufacturing and installation of the Import and local portion and bare the responsibility for the subject matter of the Contract until final acceptance is met and warranty time as specified in article 15 has expired.
DÜRR shall supervise the manufacturing and installation of the Import and local portion and bare the responsibility for the subject matter of the Contract until final acceptance is met and warranty time as specified in article 15 has expired.