Testing/commissioning document showing results confirming electrical, air-con, water hot/cold plus relevant pressure, swimming pool, drainage systems are in good working order.
Khun Bee – how much time is required for all relevant government documents etc.?
– need to discuss drawings etc. I presume once the clients depart and confirm their next return this period will be the time frame we have to gather all what is required?