transportation and bolted together for easy erection, so no welding is required. The main tube is equipped with guide rails, cable conduits for the traveling cable and the governor cable. A counterweight will also be supplied.
A service ladder inside the tube and the brackets for guide rail attachment are installed. Two (2) manholes, one on the bottom and one on the top of the tower shaft are installed. All steel parts are cleaned and supplied with a high resistive two layer painting system according to EN/ISO 12944-Class C3.
SUPER GYRO TOWER 1200 /110M