Please be informed that door screen as shown on drawing no. A_COR 5001 as attached – We have incorporated for door screen in the Contract Package 3 Rev 4 item 11 – Building A,B, C External in BOQ section C.9 Doors and also please see attached screen doors plan “Screen Door Detail 1 plan – mark up.pdf” and “Screen Door Detail 2 plan – mark up.pdf” and Re-painting existing metal roof as noted on the 04A Façade Building A roof plan (drawing no. A_A_2004 Rev. B) – We have incorporated for re-painting the existing metal roof in the Contract Package 3 Rev 4 item 10 – Building A Façade and stairs in BOQ section C.5 Roof finishes and please note that repair of leaks are included in Hammersmith Contract which will be finished and tested prior to roof painting. BUT these works did not described in GES’s BOQ description. Please advise to include or exclude?