As ceiling of tunnel at the way to in – out to the shopping mall at wireless road area falling down into at the vehicles area at wireless road side because of the roof of tunnel is subside some of part is bore and edge of roof falling down inside so the damage cause from PISA installed scaffold for installation structure and ACP as attachment file. PPS have request to ITD accelerate to modify and back change damage cost from PISA as note in memorandum as attachment file1.
Therefore, We are pleased informed to know and responsible to the damage cost about so our QS will estimate the cost and will inform to PISA later