One Minor : Refer waste water treatment procedure relate to operation manual then auditor mention we need to register Operation manual into document control. He call "External Origin Document"
Three Observation :
- Auditor observe waste water treatment room with recommend to make the gutter at front door to be spill containment control room to avoid any chemical leak to rain gutter. Also garbage still bin (Big bin) is leak then he did mention the potential of water from the garbage leak to the rain gutter. This bin from WMS who do garbage disposal company.
- Auditor did mention to our Chlorine leak emergency procedure is too generic. Then he did recommend to contact Chlorine supplier to advise for Higher level (big leak) for higher emergency response plan.
- Auditor observed our Waste management record for amount of disposals relate to manifest volume with also require record for the process generate waste records.
One Opportunity for Improvement :
Auditor recommended to setup the target of major chemical consumption relate to Waste reduction program by concept of more we use is more waste generate.
Noteworthy :
Auditor mention our ISO system implement in software is a good concept to Paper less system with recommend to transfer more paper forms to be electronic form as e-leave or any document can be the soft files.
Regarding to audit time was delay so he just closing by verbal then he will submit the formal report near future.