– Control cable pulling and Cable Termination and Grounding Installation and Cable Check Befor Handover to Commissioning and support Commissioning.Lighting work,Control Safety daily work permit,Tool and Equipment Inspection,Electrical Equipment Installation ,Operate subswich Yard,22 kv Terminator cable,Suport Circuit Breaker and Supervisor