In my view, The problem of building a bridge was to establish how lifetime and strength. When in seawater with chloride solution for steel reinforcement rust, which was born in the tidal area. This area is the structure of the bridge was exposed to seawater periodically. During the sea level minimum and maximum. The cause of the rust.