1. Carruther results (before clean)week 19
2. IQF line 3, We found the batreria trap at inside IQF line 3
3. Packing room (ASTRO) still found some issue of hygine control?
4. Enviroment at Packing room, still found condensation and water drop from ceiling Especially near the film preparation unit.
5. Maintenace and repair machine ?
6. Staff control at packing room.
Please recheck the records from your side and confirm to me.