Preparation of manual for change control
The person responsible for change control shall establish manual for change control including design change control that specifies change notification standard and procedure for the control, based on “4M Change Notification Standard”, in order to prevent variation of the change notification standard among plants or shops. The person shall additionally include control items that are original of the supplier in its procedure for change control.