1. Working Demolition of Equipment
9 meter mast dismantled
Demolition 12 meter pole
Demolition equipment
2. installation of a new transformer.
Install 12-meter pillars
Add call THW-A 1 * 50 Sq.mm system 22 kv.
System Ground
Pour casting mast
The components in the assembly
3. The fee for the electrical contact.