As reported in paragraph 2.4, after the generation of the particular SBBGR biomass, the HRT was progressively reduced down to 11 h by increasing the hydraulic loading (i.e., by increasing the wastewater volume fed to the plant).
As reported in paragraph 2.4, after the generation of theparticular SBBGR biomass, the HRT was progressively reduceddown to 11 h by increasing the hydraulic loading (i.e., byincreasing the wastewater volume fed to the plant).