In addition, the results of outage cost are used as the considered parameter for economic analysis of 115/22 kV substation construction. Furthermore, various sizes of power transformer comprised with 10/12.5,12/15,16/20 and 20/25 MVA are evaluated for optimizing project investment cost. The necessary information in this study is