6.0 Liquidated Damage
If the subcontractor cannot complete the work as per schedule in item 3, a liquidated damage 0.3% of the total
subcontract amount per delay day will be applied. The liquidated damage should be limited to max. 10% of total
subcontract amount.
7.0 Warranty Period
At least twelve (12) months after CTCI Acceptance.