Throughout the 160-day operation, washout of the biomass
was successfully avoided. The membrane retained all of the
anaerobic bacteria, and the VSS concentration improved significantly. As observed in Fig. 2(D), the VSS in the bioreactor increased from 8000 to 14,000 mg/L within 120 days. On day
127, part of the biomass was washed out into the membrane
housing because of sludge flotation, causing the VSS in the bioreactor to decrease to 12,000 mg/L (a slight decrease in the COD
removal also appeared on the same day). To solve this problem,
the recirculation rate from the membrane housing to the bioreactor was increased from 155 to 422 L/d, and a recovery was obtained after one week. At the end of the start-up phase, the VSS
in the bioreactor reached 15,000 mg/L, with only a slight washout of 800 mg/L into the membrane housing.
ตลอด 160 วันผ่าตัด ความล้มเหลวโดยสิ้นเชิงของชีวมวล
ได้หลีกเลี่ยง เมมเบรนสะสมทั้งหมดของ
anaerobic bacteria และ VSS สมาธิดีขึ้นอย่างมีนัยสำคัญ เท่าที่สังเกตใน รูปที่ 2 ( D ) , VSS ในเครื่องปฏิกรณ์ชีวภาพเพิ่มขึ้นจาก 8 , 000 , 000 มิลลิกรัม / ลิตร ภายใน 120 วัน ในวัน
127 , ส่วนหนึ่งของชีวมวลถูกล้างออกไปในเมมเบรน
ที่อยู่อาศัยเพราะตะกอนลอย ,ก่อให้เกิด VSS ในเครื่องปฏิกรณ์ชีวภาพลดลงถึง 12 , 000 mg / l ( ลดลงเล็กน้อยในการกำจัด COD
ยังปรากฏในวันเดียวกัน ) เพื่อแก้ปัญหานี้
อัตราเร็วจากที่อยู่อาศัยไปยังถังปฏิกรณ์เยื่อเพิ่มขึ้นจาก 155 422 L / D , และการกู้คืนได้ หลังจากหนึ่งสัปดาห์ เมื่อจบขั้นตอนการเริ่มต้น VSS
ในขนาดถึง 15 , 000 mg / Lมีเพียงการชะล้างเพียง 800 mg / l ในเมมเบรนเคหะ
การแปล กรุณารอสักครู่..
