In June there is still raining in some areas of the mine, so the mine pits continues to slow activity. Viet Nam contractors try to improve and expand the main road of the NPE and NPW and paving stones on the street so they can travel in the rainy season. The main ore production area is the Nampan east pit I, pit II and pit III. Current pit floor at Nampan east pit is narrow need to cut back on top for increase the production area, mine bench at NPE pit I XXXRL, NPE pit II XXXRL, NPE pit III XXXRL. Nampan west pit I is flooding and main ore load was hanging along pit wall. Therefore need to drain and cut back on top. VangKor South resumed digging pit after pumping dry enough to the digging waste and ore. Vangkor center digging work normally on a day without rain. Vangkor center extend at level 541RL-538RL. The digging of the western zone of the pit, which is a high level from ground water level.