Contractual Relationships
If the project is conducted by an outside contractor, an additional level of project control is created. In addition to the control exercised by the contractor who does the work, the sponsoring organization has its own control responsibilities. The contractor may bring its own control system to the project, and this system may need to be adapted to provide information that the sponsor needs.