After the Sub contractors (SRS Company) come to repairing the gate of waste area on July 29,2015. They have cut the crook egress. As a result, Gates dropped out of the structure. The risk of falling when it is windy.
After the Sub contractors (SRS Company) come to repairing the gate of waste area on July 29,2015. They have cut the crook egress. As a result, Gates dropped out of the structure.The risk of falling when it is windy.