construction means, methods, technique, sequence, procedures and safety and security program in connection with the performance of the work. Subcontractor warrant performance of the work (1) in a professional, prudent, good and workmanlike manner, and (2) in such a manner as to provide a reasonable likelihood that the useful life of the project provided by subcontractor will be at least equal to 20 years from issuance of the PAC