The result is that to avoid long waiting lines for projects or for activities within a project, the capacity of the scarce
resource must be signifi cantly greater than the demand for it, or else the arrival rate of jobs
must be tightly controlled so that it is no longer random. Even if the arrival rate is controlled,
it must still be at a level that is less than the service rate (which is still random).