The total number of paper is 33: 17 papers regard design, plan- ning and controlling processes and 7 and 8 papers for product de- sign and the maintenance process respectively; studies discussing the assessment process of an AR system are very low, i.e. 3. Fig. 1 shows the temporal distribution of papers under the three main categories previously introduced; the last one has not been intro- duced .