(Defective) Shock Absorber was placed into production strut assembly jig. The machine was then activated, to compress spring and complete the sub assembly of the strut. However the machine was unable to complete its cycle, due to "weld dag" preventing the strut machine from fully closing. 15 minutes production down time was required to establish the cause of the machine not operating correctly.