For PD testing report is come from Quality assurance division.
They response for testing and inspection R/M.
I have advise them for the PD testing procedure only OPEN position.
Because the position of vacuum interrupter is OPEN position from Xinxin.
It’s easy to check and testing in OPEN position.
we applied testing of both side of embedded pole to check PD in upper part and bottom part.